openPR Logo
Press release

From abandoned industrial site to modern shopping centre

10-19-2016 11:37 AM CET | Industry, Real Estate & Construction

Press release from: Climaveneta

/ PR Agency: Pivari.com
Adigeo, Verona

Adigeo, Verona

Bassano del Grappa, 18th October 2016: Built in the refurbished industrial site called Office Adige and being a part of the Adige City masterplan designed by Richard Rogers architect, the new Adigeo shopping centre has a total gross built area of 72,000 sqm and more than 140 shops. It will open in spring 2017.
The building, composed of a prefabricated reinforced concrete structure and a plated wood roof, has a modern and flat aesthetic and a trapezoidal shape based on the structure of the plot on which it rises. The building comprises 3 floors above ground and 2 basements, dedicated to parking for a total of more than 2,500 car parks. The centre is located just 500 meters from the motorway exit, that is the main entrance to Verona city, and can be easily reached by 585,000 people living within half an hour drive.

Mr. Segala, execution architect and planning supervisor says: «The project is very important from a city plan point of view because it regenerates a brownfield site on this main route to Verona centre. Adigeo is the most important refurbishment project in this area and will be for sure an incentive to the modernization of a whole part of the city with an high potential.»

The key player of the project is ECE, that in April 2015 bought 100% of the project from CDS Holding. The company is the European leader in the retail real estate market with the management of more than 196 shopping centres in 14 different countries.
In line with ECE social responsability policy, Adigeo is undergoing the LEED GOLD certification. To maximise the energy efficiency of the building, it has been essential to combine good shell insulation, highly performing glasses, with a good solar shield, and innovative M&E systems. In this respect, at Adigeo many sustainable and efficient choices were made, such us rain water recovery, white polyolefin roof to avoid hot islands, timers and snorkels installation in the taps for a water consumption reduction up to 20%. Furthermore, there’s a large use of renewable sources, such as a fotovoltaic field with a total power of 500kW, solar panels for sanitary hot water production and installation of air-source heat pump for the air conditioning of the mall.

FOCUS ON THE HVAC SYSTEM

The HVAC system has been designed following the LEED prerequisites, with a strong focus on sustainability and energy efficiency. 16 WHISPER ENTHALPY air source roof top units by Climaveneta have been installed, for a total air flow of 500.000 m3/h, and 1 air to air reversible heat pump NECS-N/CA in Class A efficiency.

Mr Zenucchi, the M&E designer says: «At Adigeo we have designed the M&E systems using state-of-the-art technologies now available on the market. The goal was to combine the most efficient performances of the building and the respect of the investor’s budget».
Going in details, the HVAC system is divided into three different parts: the mall is air conditioned by high efficiency WHISPER roof top units, able to exploit the enthalpic rotary heat recovery for the pre-heating of the external fresh air and to recover the rejected heat for the air renewal getting very positive COP values. Furthermore, the highly energy-efficient plug-fan type, with backward blades, are directly coupled to the motor, meaning they boast intrinsic reliability and efficiency due to the absence of belts and related energy loss.
Small shops are served by a mixed system based on air-air units and thermostatic loop. This grants high performances, above all in mid seasons because it takes advantage of the free-cooling effect between external and internal shops, with a very high seasonal average efficiency.
The air renewal system is the same for all shops and is based on a heat pump working for the pre heating in winter time and for the pre cooling in summer period. Medium shops, with a surface of more than 400 sqm, are equipped with independent HVAC systems.

To grant a perfect internal comfort, a great attention was paid to air distribution avoiding any air draft through the installation of high quality air diffusors, always trying to combine architectural, aesthetic and technical needs. To keep always the best air conditions, F7 and F8 high efficiency filtration systems were selected both on AHU and roof top units, with a continuous monitoring of the internal air quality.

Stefano Venturini, Project Manager at Panzeri SpA says: «Nowadays technological systems play an important role in buildings, even contributing to enhance their economic value. On the other side we have to consider both investors and end users, who now pay a great attention toward comfort and proper air treatment, than in the past, when they were considered secondary aspects».

Press Kit + Pictures:
http://www.climaveneta.com/EN/Media/Press-Releases/1125.html

Follow Climaveneta:
www.climaveneta.com
youtube.com/user/climavenetaweb, @ClimavenetaHVAC, linkedin.com/company/climaveneta, facebook.com/climavenetahvac/

Media Relations
Sara Di Clemente
sara.diclemente@climaveneta.com

Climaveneta is the European leader in central climate control systems, providing high efficiency, sustainable HVAC & HPAC solutions for commercial, retail, residential, and data centre customers.
With 45 years of experience, Climaveneta’s solutions-led approach combines optimum comfort and premium energy efficiency to ensure an attractive return on investments and the highest standards of environmental respect in every kind of building.
Based on 8 specialised production centres in Europe, China and India, Climaveneta integrates air-conditioning, heating, and process cooling solutions with measurement devices and services in the most prestigious, complex and demanding projects worldwide through its global network of branches and business partners.
Climaveneta is a group company of Mitsubishi Electric

Climaveneta
Plant of via Sarson, 57/c
36061 Bassano del Grappa (VI)
Italy
+390424509500
http://www.climaveneta.com

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release From abandoned industrial site to modern shopping centre here

News-ID: 373958 • Views:

More Releases from Climaveneta

At Abi D’Oru comfort means energy savings
At Abi D’Oru comfort means energy savings
Abi D’Oru Resort The Abi D’Oru resort is located on the north coast of Sardinia near Porto Rotondo, one of the most exclusive locations in Italy. It extends for 3 hectares and has: 177 rooms, 4 restaurants, 3 bars, an outdoor pool, gym, private beach, Spa, and 2 tennis courts. The hotel was built in 1963 and it was refurbished and extended in 2000. It is a seasonal hotel open from
Las Piedras Shopping
Las Piedras Shopping
The city of Las Piedras is a fast-growing urban center, as a result, the Montevideo metropolitan capital development, where the new Las Piedras shopping center is located, was inaugurated in May. The main features of the mall are; 38,000 sqm, a hundred shops, five cinemas, a hypermarket, a large food court with twelve dining options and a capacity of six hundred people, and a large covered parking area are, which
Moving from heat waste to heat recovery
Moving from heat waste to heat recovery
The project Mitsubishi Electric Hydronics & IT Cooling Systems, through its brand Climaveneta has recently supplied two heat pumps for Fortum’s district heating in Espoo, Finland. Fortum, a Finnish energy company, will utilize waste heat from a data center and supply the heat into a district heating network. The data center belongs to Ericsson, a multinational networking and telecommunications equipment and services company based in Sweden. A win-win solution Ericsson needed more cooling
A green hotel on a green island
A green hotel on a green island
Mitsubishi Electric Hydronics & IT Cooling Systems, through its brand Climaveneta, has recently supplied HVAC units to the new luxury hotel now under construction at Benitses Beach in Corfu, also known as the “Green Island” for its thick vegetation. The complex includes a 5-star hotel, 40 bungalows and furnished villas, with a total capacity of 893 beds. It is the first large hotel in Greece, designed to avoid the use

All 5 Releases


More Releases for Adige

Reed Valve market: High-growth Segments and their Share Forecasts | CRP Group, A …
" The Reed Valve global market is thoroughly researched in this report, noting important aspects like market competition, global and regional growth, market segmentation and market structure. The report author analysts have estimated the size of the global market in terms of value and volume using the latest research tools and techniques. The report also includes estimates for market share, revenue, production, consumption, gross profit margin, CAGR, and other key factors.
Reed Valve Market 2021 – Global Industry Analysis, Size, Share, Trends, Market …
The Global “Reed Valve Market” provides a comprehensive assessment of the market environment that covers both current and future market conditions. In terms of drivers, opportunities, and constraints, research provides information on evolving trends and market dynamics. The report also includes a competitive profile of major bar feeder product suppliers and their latest developments. Trends that are expected to impact the long-term outlook for the industry are analysed in the
LEAOS Pressed E-Bike Indiegogo Crowdfunding to industrialize production
The successful superlight LEAOS Pressed E-Bike is on sale since spring 2019. In order to reduce production costs we industrialize the frame production. In wintertime we launch the campaign. Subscribe now to get up to 40% off for the Pressed E-Bike during campaign period only. The LEAOS Pressed E-Bike is completely made in Italy. The frame is made in Bologna. With the support of the campaign we are able to
The shopping centre market in Europe: increasingly sustainable.
New shopping centre developments in Europe According to the latest European Shopping Centre Development Report there is an increasing number of new shopping centre developments, after a weak first half of the year in 2016. If the entire expected built area in Europe will be delivered on time, the total number of the shopping centres will increase from 156.3 million square meters – recorded at the end of the first half
From factory to sustainable mall
The refurbishment of the abandoned Officine Adige factory area is called Adige City and was designed by the famous architect Richard Rogers. In the masterplan there is also a mall, Adigeo, with a gross leasable area (GLA) of 42,000 square meters, which will open in 2017 with about 130 shops and services. The area is located just 500 meters from the A4 motorway exit, which gives access to Verona city center
ItalyItalia proposes a wide selection of hotel for the 2010/2011 ski season.
From Valle d'Aosta to Trentino Alto Adige, ItalyItalia offers ski lovers a choice of over 350 hotels ideal for skiing breaks. The 2010/2011 awaited skiing season has now taken off traditionally after the 8 December; however for the first time in 40 years the Italian mountains have been hosting skiers since the end of October, due to early snowfall. ItalyItalia, the portal specialising in quality holidays in Italy, offers ski